Road closures – Thanet Road and St Helen’s Road

  • road works
  • Thanet Road, York will be closed between its junctions with Chaloner’s Road and Eason View, York (ii) Railway View, York between its junction with Thanet Road and a point 10metres north east of the said junction from 0900hrs on 18th November until 2400hrs on 19th November 2015 for carriageway resurfacing works.  Additionally, the ‘ONE WAY’ direction of traffic flow in Eason View is suspended during the period of physical closure to allow two-way traffic flow in the said road when the closure is put into effect. During the works period vehicle movements between Easson View and St Helen’s Road will be controlled by two-way traffic signals. It is envisaged that the closure will be put in place in two phases, with on day for each phase during the works period. An alternative route for diverted traffic will be signed during the works period.
  • St Helen’s Road, York will be closed between the respective western property boundaries of No.’s 5 and 12 St Helen’s Road from 0001hrs on 20th November until 2400hrs on 26th November 2015 for carriageway resurfacing works. It is envisaged that the restrictions will only be put into effect between 0900hrs and 1600hrs on Friday 20th November 2015. An alternative route for diverted traffic will be available:from the eastern closure point via St Helen’s Road, Tadcaster Road, Moor Lane, Chaloner’s Road, Thanet Road and St Helen’s Road.
    from the western closure point via St Helen’s Road, Eason View, Chaloner’s Road, Moor Lane, Tadcaster Road and St Helen’s Road.
  • Details of other road closures can be found by clicking here

Leave a Reply

Your email address will not be published. Required fields are marked *