TalkTalk publish timetable for repair work

TalkTalk has published a timetable setting out when tarmac strips across concrete driveways will be replaced with concrete, and other repairs made to footpaths and verges following the UFO cable installation work.

Dates correct as at 31 May 2018

Lib Dem councillor Andrew Waller met with representatives of TalkTalk and contractors FNS on Friday 1 June to visit locations across Westfield and Dringhouses & Woodthorpe wards where there are concerns about the reinstatement works done so far.

Leave a Reply

Your email address will not be published. Required fields are marked *